Sootblower optimization in black liquor recovery boiler

The Gruvön Mill has since installing HISS optimized steam sootblowing 11 months ago been operating their 2700 TDS/day BLRB on 7 % higher average load than the previous year. At the same time steam consumption of the steam soot blowers has been reduced by 30 %. Contact us for a detailed case description.