Stockholm, coal, Sweden

Location Sweden
Plant information: Silo
Size: 1200 m3
Fuel: Ashes from combustion of coal
Installation year/s: 2007
Infrasound generators: 1 x APM150
Cleaning area: Silo made of concrete with a size of 1200 m3

The purpose of installing the infrasound generator was to remove ashes stuck on the inner walls of the silo. Earlier the staff had to enter the silo with safety lines and try to remove the ashes manually. This was a very unsafe procedure since large amounts of ashes could fall on the staff.

You can download the whole report if you want to read more about our installation in Stockholm. You need to enter your email address for us so we can to send you a link. Then, just click on the link that you received in your email and the document is downloaded.

Download the report!